Lighting Schedule Compliance

The percentage of time each lighting circuit's on/off state matched the agreed schedule for its space. The primary discipline indicator for lighting — unlike HVAC, where comfort can excuse non-compliance, lighting run against schedule is almost always pure waste.

01 Metric Definition

What it measures and how it is calculated

What it measures

The percentage of time each lighting circuit's on/off state matched the agreed schedule for its space, averaged across the spaces in scope for the period. At portfolio level the metric reframes as the percentage of sites whose schedule compliance meets the per-site threshold. It is the primary discipline indicator for lighting: lights left on overnight, exterior lights running mid-day, or parking lights on during daylight are each a schedule violation. Unlike HVAC, where comfort can partially excuse non-compliance, lighting non-compliance is almost always pure waste.

How it is calculated

The metric is the share of sampled intervals where the circuit's actual on/off state matched its scheduled state, with a short boundary tolerance (a few minutes, configurable) so a circuit turning off slightly late is not flagged.

compliance_circuit = matching intervals / total intervals × 100.

compliance_space = average across the circuits in that space.

compliance_site = average across spaces after the in-scope filter is applied.

The metric only exists where a schedule is configured and mapped to the circuit or space. Circuits with no schedule are excluded from the average — they are not counted as non-compliant.

Reference thresholds

RangeClassificationInterpretation
≥ 90% per circuitCompliantCircuit tracks its schedule within tolerance; no action required. Include in MBR trend.
75 – 90% per circuitWatch zoneFlag for monitoring; investigate if sustained over two consecutive periods. Often an early sign of schedule drift or a stale template.
< 75% per circuitNon-compliantDiagnose per the action guide: auto-revert first, then decide template fix vs local control fault.

Reference thresholds only — examples to calibrate per client, site, space, and circuit. Targets are configurable: a common starting point is ≥ 90% per circuit at site level and ≥ 85% of stores compliant at portfolio level, to be agreed with each client. Photocell-controlled spaces (exterior, parking) are a special case — their state is driven by ambient light, not the clock; until ambient-light integration ships, exclude them or give them a wide-tolerance schedule.

Portfolio compliance target

The target percentage of stores compliant (reference: 85% of stores, with ≥ 90% per circuit at site level) should be defined and agreed with each client. These defaults are starting points only and are configurable per client, site, space, and circuit.

02 Impact

How this metric moves the customer value drivers

The table below shows how moving Schedule Compliance impacts each customer value driver the product is designed to improve — the metric page explains the mechanism; the product pages express the magnitude.

Value driverImpact strengthHow Schedule Compliance moves this lever
Energy savingsDirect, primaryOff-schedule lighting is energy spent with no operational benefit — sales lighting on after close, exterior or parking lights on at mid-day, a zone left lit overnight. Because lighting non-compliance is almost always pure waste, restoring schedule compliance is the most direct lever to cut lighting kWh. Lighting is commandable, so the platform reverts the circuit to its scheduled state automatically rather than waiting for a site visit.
SustainabilityIndirectEliminated off-schedule run-hours convert directly into avoided energy, and avoided energy converts into lower CO2e. Schedule Compliance is the cleanest evidence that the lighting reductions are real and sustained — useful when a client reports against an emissions or efficiency commitment.
03 Detection

How it surfaces and when it is reviewed

How it surfaces

Alarm
Off-schedule lighting fires when a circuit's actual on/off state runs against its scheduled state beyond the boundary tolerance for a sustained period. The platform auto-reverts the circuit to schedule where controls allow.
Equipment
Schedule compliance shown out of range for the affected circuit in the Site Dashboard per-circuit table, with the detected on/off state displayed.
Site
Individual circuit or space flagged in the Lighting Detail or Top/Worst Performers tab; site compliance shown against the per-site threshold.
Portfolio
Percentage of stores meeting the per-site threshold drops below agreed target in the Executive Summary dashboard. A single space below target across many sites surfaces here as a template problem, not a fleet of independent faults.

Review cadence

Monthly
Reviewed during MBR using the portfolio trend chart — percentage of stores compliant, with the worst space types called out.
Weekly
Operations team reviews the worst-performing circuits and confirms auto-reverts are holding.
Real-time
Alarm triggered on sustained off-schedule operation where configured; auto-revert runs first, investigation follows only if it does not hold.
04 Alarms

Principal alarms derived from this metric

The table below summarizes the alarms that fire directly from Schedule Compliance. Each row links to the full operational detail (trigger, preconditions, action plan, human role, escalation, prevention) in the SOPs catalog.

AlarmDescriptionSeverityTierAI executes?Value driversSOP
Off-schedule lighting A lighting circuit's on/off state is against its agreed schedule — exterior or parking lights on at mid-day, sales lighting on after close, or a zone dark during operating hours. Medium Essential Yes Energy savings Open SOP →
More alarms in development

Single alarm today: Off-schedule lighting (auto-revert first, then template fix vs local control fault). Roadmap (single-metric): schedule-drift trend per space type. Composite alarms in development (multi-metric): photocell/ambient-light integration so exterior and parking spaces are scored on \"on when ambient < X lux\" instead of being excluded.

05 Actions

What to do based on the alarm

The action plan for each alarm lives on its own SOP page in the SOPs catalog — with the diagnostic steps, human role, value drivers, escalation, and prevention specific to that alarm. The list below maps each alarm to its SOP.

  • Off-schedule lighting → — A lighting circuit's on/off state is against its agreed schedule — exterior or parking lights on at mid-day, sales lighting on after close, or a zone dark during operating hours.

Wrong template vs local control fault (metric-level — not a single alarm)

Before dispatching anyone, separate the two failure modes. If the SAME space type is below target across MANY sites, the template schedule is wrong for that space — for example a store open until 23:00 with lighting scheduled to 22:00. Fix the schedule centrally and propagate it to every affected space; do not dispatch a technician to each site. If compliance is low at ONE site only, treat it as a local control fault (manual switch left on, photocell drift, an unsynchronized time clock, a stuck contactor) and scope a maintenance check. Reading the portfolio view first prevents a template error from being mistaken for dozens of independent field problems.

Responsible
Keedian operations team
Urgency
Medium — a wrong template wastes energy across every site until it is corrected
Client approval
No for the central schedule correction; site dispatch follows the maintenance agreement

Photocell-controlled spaces (exterior, parking) — special case (metric-level)

Exterior and parking lighting is driven by ambient light, not the clock, so a clock-based schedule will flag normal daylight switching as non-compliance. Until ambient-light integration ships, exclude these spaces from the compliance average or give them a wide-tolerance schedule, and label them clearly so they are not read as failures in the MBR. When integration is available, the schedule for these spaces should encode "on when ambient < X lux" rather than a fixed time.

Responsible
Keedian operations team
Urgency
Low — configuration hygiene; prevents false non-compliance
Client approval
No

Data or metering gap suspected (metric-level)

If compliance values look implausible — a circuit with no schedule mapped being counted as non-compliant, or a gap in the on/off sampling read as off-schedule — escalate internally before treating any alarm as real. Confirm the circuit has a schedule configured and mapped (unmapped circuits are excluded by design, not flagged). Do not report the affected site as non-compliant in the MBR until the gap is resolved; document the period affected so it can be excluded or recalculated.

Responsible
Keedian technical team
Urgency
High — unreliable data affects compliance reporting and ROI calculations
Client approval
No
06 Escalation

When and how to escalate

Per-alarm escalation criteria live in the Escalation block of each SOP in the SOPs catalog. The patterns below are metric-level — read from the portfolio view, not from any single alarm firing.

Portfolio-level patterns — typically communicated in the MBR
  • Portfolio schedule compliance below target for two or more consecutive months
  • A single space type systematically below target across many sites — flag as a template schedule problem and propose a coordinated central correction, not per-site dispatch
  • Sites with persistent off-schedule circuits over multiple months that survive every auto-revert and per-SOP remediation — likely a recurring local control fault
Cross-alarm urgency — typically requires out-of-cycle communication
  • A template schedule error confirmed across the fleet — pause MBR reporting for the affected space type until the schedule is corrected and recalculated
  • Auto-revert blocked by local controls at multiple sites — a manual reset is required; notify site operations out of cycle
  • Any off-schedule finding with direct financial or reputational impact for the client (energy budget overrun, public-visibility exterior lighting, audit exposure)
07 Prevention

Controls to avoid recurring issues

Configuration controls

  • Define and map a schedule to every controllable circuit at go-live — time-of-day on/off, day-of-week variations, and the holiday calendar for the space
  • Exclude or set a wide tolerance on photocell-controlled spaces (exterior, parking) until ambient-light integration ships, so daylight-driven switching is not flagged as non-compliance
  • Document any agreed deviation from the standard space schedule at the circuit level so it is not later read as drift

Monitoring controls

  • Configure the off-schedule alarm with a short boundary tolerance so a circuit turning off slightly late is not flagged, and confirm auto-revert is holding
  • Track compliance by space type, not only by site — a space type low across many sites is a template problem, a single site low is a local control fault
  • Flag any circuit in the watch zone for two consecutive periods before it becomes an escalation item

Reporting controls

  • Run a schedule sync routine whenever store hours or corporate policy change, propagating the update to every affected space in the same cycle
  • Include the schedule compliance portfolio trend — percentage of stores compliant — in every MBR
  • Maintain a log of template schedule corrections and the date applied so historical compliance can be interpreted correctly