Every optimization metric Keedian computes, as one row. A metric is a measured signal; its alarms are the procedures (SOPs) that fire from it. Filter by product or availability tier; click any header to sort; drag the right edge of a header to resize a column. Click a metric to open its detail page — definition, reference, and the alarms it triggers.
| Metric | Applies to | Unit | Availability tier | Alarms |
|---|---|---|---|---|
|
Runtime
Average compressor hours per day while actively running. The baseline signal for operational health — flags equipment running too long...
|
hvac
|
hours/day | essential | 3 |
|
Cooling ΔT
Temperature difference a cooling stage develops across its heat-transfer surface — return vs supply air on an RTU or AHU, chilled-water...
|
hvac
|
°F air · °C water (ΔT) | essential | 2 |
|
Setpoint Compliance
Percentage of time the thermostat setpoint matched the agreed corporate policy. Measures whether the system is being operated as...
|
hvac
|
% of intervals | essential | 1 |
|
Temperature Compliance
Percentage of time actual space temperature was within the expected range during evaluated hours. Measures the physical outcome —...
|
hvac
|
% of intervals | essential | 2 |
|
Chiller Plant Operational Compliance
Weighted score of the six operating sequences the plant's BMS is supposed to hold — a chiller running with its chilled-water pump, its...
|
hvac
|
% weighted score | essential | 3 |
|
Plant Efficiency (kW/ton)
The plant's electrical input divided by its cooling output — kW drawn per ton of cooling delivered, the standard measure of how...
|
hvac
|
kW/ton | essential | 1 |
|
VAV Airflow & Damper Performance
Whether each VAV box actually delivers the supply airflow its control loop is calling for — measured airflow against the box's commanded...
|
hvac
|
% of commanded CFM | essential | 3 |
|
AHU Supply-Air Temperature Compliance
The share of run-time the air handler held its supply-air (discharge) temperature at the value its sequence commanded — including any...
|
hvac
|
% of intervals in band | essential | 2 |
|
AHU Fan, Static & Filter Performance
Whether the supply (and return) fan and its variable-frequency drive deliver the airflow and static the floor needs at the fan speed and...
|
hvac
|
% speed · kW vs airflow | essential | 3 |
|
Energy consumption
Total active energy the site draws, by interval and billing period, trended against the site's own history and reconciled to the utility...
|
energy
|
kWh | essential | 3 |
|
Peak demand
The highest 15-minute power draw in the period, with the time it occurred. On demand-billed accounts this peak drives the demand charge...
|
energy
|
kW (15-min) | essential | 1 |
|
Per-circuit power & current
Real power and current of an individual circuit — an RTU, the refrigeration rack, the lighting panel — captured by a submeter. Turns the...
|
energy
|
kW / A | optimized | 1 |
|
Cycling frequency
How often equipment starts per hour and how long each cycle runs. Short-cycling is the most destructive and most fixable failure mode in...
|
energy
|
starts/hour | optimized | 1 |
|
Service voltage
Delivered voltage at the service, trended against the nominal band. Sustained under- or over-voltage overheats motors and shortens the...
|
energy
|
V (RMS) | optimized | 2 |
|
Power factor
The ratio of real to apparent power at the service. Where the tariff bills it, a low power factor adds a reactive-power penalty to the...
|
energy
|
PF (0–1) | optimized | 1 |
|
Schedule Compliance
The percentage of time each lighting circuit's on/off state matched the agreed schedule for its space. The primary discipline indicator...
|
lighting
|
% of intervals | essential | 1 |
|
Utilization
The percentage of time circuits were actually on, averaged across the spaces in scope. Where Schedule Compliance asks whether the lights...
|
lighting
|
% on | essential | 1 |
|
Burn Hours
Average hours per day each circuit was on — the absolute version of utilization. Kept as its own metric because it drives lamp-life...
|
lighting
|
hours/day | essential | 1 |
|
Continuity Posture
The building's electrical-continuity rollup: the share of critical backup points that are both ready and have their redundancy available...
|
all
|
% of critical backup points ready | essential | 1 |
|
Backup Autonomy
Estimated ride-through time for a building's critical load if the primary source fails now — the UPS bridges the transfer on battery,...
|
all
|
minutes (UPS bridge) + hours (generator on fuel) | managed | 2 |
|
UPS Battery Readiness
Whether the UPS will actually bridge the transfer when the primary source fails: battery-bank health and capacity versus nominal, state...
|
all
|
% capacity vs nominal · autonomy minutes · SoC % | essential | 2 |
|
Generator Start Readiness
The one question a standby generator has to answer — will it start and take the load when the UPS bridge runs out? Read from AUTO-mode...
|
all
|
AUTO/MANUAL · start-battery V · fuel % · last-test result | essential | 1 |
|
Vertical Transport Availability
The share of the building's elevators and escalators in service right now. A unit that reports out-of-service, sits in a controller...
|
all
|
% units in service | essential | 4 |
|
Fire System Readiness
The standing readiness of the life-safety system between inspections — is the fire panel clear of any supervisory or trouble condition,...
|
all
|
readiness state — supervisory / trouble / comms / inspection | essential | 4 |
|
Food-Safety Compliance Record
Auditable temperature record and critical-event traceability per refrigeration asset for HACCP / FDA compliance. Metric definition in...
|
all
|
— | essential | 0 |
|
Foodservice Equipment Availability
Operating status and temperature per oven, fryer, broiler, and deli station, so a down unit is caught before sales are lost. Metric...
|
all
|
— | essential | 0 |
|
Demand-Response Participation
Enrollment, curtailment execution, and post-event verification for RTUs in utility demand-response programs. Metric definition in...
|
all
|
— | essential | 0 |
|
Indoor Air Quality
CO2, VOC, and PM2.5 per zone against ventilation-effectiveness thresholds. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Air-Curtain Activation Compliance
On/off state and runtime per air-curtain unit against door-activity expectations. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Restroom Odor Index
VOC / odor index per restroom against a spike threshold. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Refrigerant Compliance Record
Charge, leak-event, and recovery tracking for EPA Section 608 / state refrigerant compliance, across HVAC and commercial-refrigeration...
|
all
|
— | essential | 0 |
|
Refrigerant Charge Health
Charge-loss signature with lead time to a predicted refrigerant-leak failure, across HVAC and commercial-refrigeration assets. Metric...
|
all
|
— | essential | 0 |
|
Defrost Cycle Performance
Whether each case runs the defrost cycles it is commissioned for — that a cycle starts on schedule, terminates on its configured...
|
refrigeration
|
defrost cycles completing as configured | managed | 4 |
|
Rack Discharge Pressure
Whether the rack holds discharge (high-side) pressure under control against its commissioned limits, and whether its protection sequence...
|
refrigeration
|
discharge pressure held within commissioned limits | managed | 4 |
|
Rack Suction Pressure
Whether the rack holds suction (low-side) pressure against its active operating target. Suction that runs high past its delay starves...
|
refrigeration
|
suction pressure held against the active setpoint | managed | 3 |
|
Rack Pump-Down Performance
Whether the rack's pump-down sequence completes as commissioned — reaching its pump-down setpoint within its delay, not aborting, and...
|
refrigeration
|
pump-down sequences completing as configured | managed | 3 |
|
Emergency Lighting Readiness
Self-test pass rate and battery health for emergency egress fixtures. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Exterior Lighting Schedule Compliance
Photocell / astronomical-clock driven on/off adherence for parking-lot, canopy, signage, and facade lighting. Metric definition in...
|
all
|
— | essential | 0 |
|
Utility Data Feed Health
Completeness and freshness of the interval / cost feed pulled from utility connectors. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Tariff Alignment
Consumption profile against the applicable rate structure and demand windows. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Utility Bill Accuracy
Billed charges reconciled against metered consumption and contracted rates. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Demand-Response Portfolio Participation
Portfolio enrollment, event response, and incentive verification across eligible sites. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Renewable Generation Reconciliation
Generation vs consumption, PPA invoice validation, and REC accounting. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Vendor SLA Performance
Vendor response and resolution against SLA on referred work. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Cross-Asset Benchmark
Per-site and per-asset performance ranked against the portfolio. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Refrigeration Temperature Integrity
Temperature and operating status for cafeteria, pantry, and vending refrigeration. Metric definition in progress — alarms to be defined.
|
all
|
— | essential | 0 |
|
Refrigeration Temperature Compliance
The share of valid temperature readings in the period that fall inside each asset's configured operating band. It is the earliest signal...
|
refrigeration
|
% of valid readings in band | essential | 2 |
|
Refrigeration Door Exposure
The operational exposure that refrigeration-door activity creates on door-equipped assets — openings per period, average open duration,...
|
refrigeration
|
openings, minutes open, % time open | essential | 1 |
|
Refrigeration Temperature Recovery
The time an asset takes to return to its configured band after a known disturbance — a prolonged door opening, a controller-exposed...
|
refrigeration
|
minutes to recover, recovery slope | optimized | 2 |