Productization

Optimization Metrics catalog.

Every optimization metric Keedian computes, as one row. A metric is a measured signal; its alarms are the procedures (SOPs) that fire from it. Filter by product or availability tier; click any header to sort; drag the right edge of a header to resize a column. Click a metric to open its detail page — definition, reference, and the alarms it triggers.

Showing 49 of 49 metrics
Metric Applies to Unit Availability tier Alarms
Runtime
Average compressor hours per day while actively running. The baseline signal for operational health — flags equipment running too long...
hvac
hours/day essential 3
Cooling ΔT
Temperature difference a cooling stage develops across its heat-transfer surface — return vs supply air on an RTU or AHU, chilled-water...
hvac
°F air · °C water (ΔT) essential 2
Setpoint Compliance
Percentage of time the thermostat setpoint matched the agreed corporate policy. Measures whether the system is being operated as...
hvac
% of intervals essential 1
Temperature Compliance
Percentage of time actual space temperature was within the expected range during evaluated hours. Measures the physical outcome —...
hvac
% of intervals essential 2
Chiller Plant Operational Compliance
Weighted score of the six operating sequences the plant's BMS is supposed to hold — a chiller running with its chilled-water pump, its...
hvac
% weighted score essential 3
Plant Efficiency (kW/ton)
The plant's electrical input divided by its cooling output — kW drawn per ton of cooling delivered, the standard measure of how...
hvac
kW/ton essential 1
VAV Airflow & Damper Performance
Whether each VAV box actually delivers the supply airflow its control loop is calling for — measured airflow against the box's commanded...
hvac
% of commanded CFM essential 3
AHU Supply-Air Temperature Compliance
The share of run-time the air handler held its supply-air (discharge) temperature at the value its sequence commanded — including any...
hvac
% of intervals in band essential 2
AHU Fan, Static & Filter Performance
Whether the supply (and return) fan and its variable-frequency drive deliver the airflow and static the floor needs at the fan speed and...
hvac
% speed · kW vs airflow essential 3
Energy consumption
Total active energy the site draws, by interval and billing period, trended against the site's own history and reconciled to the utility...
energy
kWh essential 3
Peak demand
The highest 15-minute power draw in the period, with the time it occurred. On demand-billed accounts this peak drives the demand charge...
energy
kW (15-min) essential 1
Per-circuit power & current
Real power and current of an individual circuit — an RTU, the refrigeration rack, the lighting panel — captured by a submeter. Turns the...
energy
kW / A optimized 1
Cycling frequency
How often equipment starts per hour and how long each cycle runs. Short-cycling is the most destructive and most fixable failure mode in...
energy
starts/hour optimized 1
Service voltage
Delivered voltage at the service, trended against the nominal band. Sustained under- or over-voltage overheats motors and shortens the...
energy
V (RMS) optimized 2
Power factor
The ratio of real to apparent power at the service. Where the tariff bills it, a low power factor adds a reactive-power penalty to the...
energy
PF (0–1) optimized 1
Schedule Compliance
The percentage of time each lighting circuit's on/off state matched the agreed schedule for its space. The primary discipline indicator...
lighting
% of intervals essential 1
Utilization
The percentage of time circuits were actually on, averaged across the spaces in scope. Where Schedule Compliance asks whether the lights...
lighting
% on essential 1
Burn Hours
Average hours per day each circuit was on — the absolute version of utilization. Kept as its own metric because it drives lamp-life...
lighting
hours/day essential 1
Continuity Posture
The building's electrical-continuity rollup: the share of critical backup points that are both ready and have their redundancy available...
all
% of critical backup points ready essential 1
Backup Autonomy
Estimated ride-through time for a building's critical load if the primary source fails now — the UPS bridges the transfer on battery,...
all
minutes (UPS bridge) + hours (generator on fuel) managed 2
UPS Battery Readiness
Whether the UPS will actually bridge the transfer when the primary source fails: battery-bank health and capacity versus nominal, state...
all
% capacity vs nominal · autonomy minutes · SoC % essential 2
Generator Start Readiness
The one question a standby generator has to answer — will it start and take the load when the UPS bridge runs out? Read from AUTO-mode...
all
AUTO/MANUAL · start-battery V · fuel % · last-test result essential 1
Vertical Transport Availability
The share of the building's elevators and escalators in service right now. A unit that reports out-of-service, sits in a controller...
all
% units in service essential 4
Fire System Readiness
The standing readiness of the life-safety system between inspections — is the fire panel clear of any supervisory or trouble condition,...
all
readiness state — supervisory / trouble / comms / inspection essential 4
Food-Safety Compliance Record
Auditable temperature record and critical-event traceability per refrigeration asset for HACCP / FDA compliance. Metric definition in...
all
essential 0
Foodservice Equipment Availability
Operating status and temperature per oven, fryer, broiler, and deli station, so a down unit is caught before sales are lost. Metric...
all
essential 0
Demand-Response Participation
Enrollment, curtailment execution, and post-event verification for RTUs in utility demand-response programs. Metric definition in...
all
essential 0
Indoor Air Quality
CO2, VOC, and PM2.5 per zone against ventilation-effectiveness thresholds. Metric definition in progress — alarms to be defined.
all
essential 0
Air-Curtain Activation Compliance
On/off state and runtime per air-curtain unit against door-activity expectations. Metric definition in progress — alarms to be defined.
all
essential 0
Restroom Odor Index
VOC / odor index per restroom against a spike threshold. Metric definition in progress — alarms to be defined.
all
essential 0
Refrigerant Compliance Record
Charge, leak-event, and recovery tracking for EPA Section 608 / state refrigerant compliance, across HVAC and commercial-refrigeration...
all
essential 0
Refrigerant Charge Health
Charge-loss signature with lead time to a predicted refrigerant-leak failure, across HVAC and commercial-refrigeration assets. Metric...
all
essential 0
Defrost Cycle Performance
Whether each case runs the defrost cycles it is commissioned for — that a cycle starts on schedule, terminates on its configured...
refrigeration
defrost cycles completing as configured managed 4
Rack Discharge Pressure
Whether the rack holds discharge (high-side) pressure under control against its commissioned limits, and whether its protection sequence...
refrigeration
discharge pressure held within commissioned limits managed 4
Rack Suction Pressure
Whether the rack holds suction (low-side) pressure against its active operating target. Suction that runs high past its delay starves...
refrigeration
suction pressure held against the active setpoint managed 3
Rack Pump-Down Performance
Whether the rack's pump-down sequence completes as commissioned — reaching its pump-down setpoint within its delay, not aborting, and...
refrigeration
pump-down sequences completing as configured managed 3
Emergency Lighting Readiness
Self-test pass rate and battery health for emergency egress fixtures. Metric definition in progress — alarms to be defined.
all
essential 0
Exterior Lighting Schedule Compliance
Photocell / astronomical-clock driven on/off adherence for parking-lot, canopy, signage, and facade lighting. Metric definition in...
all
essential 0
Utility Data Feed Health
Completeness and freshness of the interval / cost feed pulled from utility connectors. Metric definition in progress — alarms to be defined.
all
essential 0
Tariff Alignment
Consumption profile against the applicable rate structure and demand windows. Metric definition in progress — alarms to be defined.
all
essential 0
Utility Bill Accuracy
Billed charges reconciled against metered consumption and contracted rates. Metric definition in progress — alarms to be defined.
all
essential 0
Demand-Response Portfolio Participation
Portfolio enrollment, event response, and incentive verification across eligible sites. Metric definition in progress — alarms to be defined.
all
essential 0
Renewable Generation Reconciliation
Generation vs consumption, PPA invoice validation, and REC accounting. Metric definition in progress — alarms to be defined.
all
essential 0
Vendor SLA Performance
Vendor response and resolution against SLA on referred work. Metric definition in progress — alarms to be defined.
all
essential 0
Cross-Asset Benchmark
Per-site and per-asset performance ranked against the portfolio. Metric definition in progress — alarms to be defined.
all
essential 0
Refrigeration Temperature Integrity
Temperature and operating status for cafeteria, pantry, and vending refrigeration. Metric definition in progress — alarms to be defined.
all
essential 0
Refrigeration Temperature Compliance
The share of valid temperature readings in the period that fall inside each asset's configured operating band. It is the earliest signal...
refrigeration
% of valid readings in band essential 2
Refrigeration Door Exposure
The operational exposure that refrigeration-door activity creates on door-equipped assets — openings per period, average open duration,...
refrigeration
openings, minutes open, % time open essential 1
Refrigeration Temperature Recovery
The time an asset takes to return to its configured band after a known disturbance — a prolonged door opening, a controller-exposed...
refrigeration
minutes to recover, recovery slope optimized 2