Productization
← Back to SOPs catalog
Keedian operations · Standard procedure

Chedraui — HVAC Change Requests.

Handle Chedraui hot/cold complaints — diagnose units in Ultrasite (status, space / supply / outside temps, relay states), distinguish mechanical failures from comfort-only requests, and only apply a temporary setpoint override after explicit Chedraui Operations Center approval.

01 Detail

Trigger, action plan, and escalation criteria.

ad_hoc_client Client: Chedraui hvac medium managed tier AI: hybrid
Value drivers
Customer experience Energy savings Avoided truck rolls
Preconditions
Ultrasite access for the Chedraui site; Corrigo access for WO tracking; the Chedraui OC is reachable for approval; complaint is documented in the Keedian ticket.
Human role
BSS (refrigeration team) diagnoses the unit in Ultrasite, calls the Chedraui OC for approval before any override, applies the timed override exactly as approved, then clears it at end-of-window.
Action plan
(1) Create or update a Keedian ticket: store ID, caller name/role, areas affected, complaint (too hot / too cold); connect to the site in Ultrasite; record current zone temps and setpoints. Store staff alone is not sufficient approval. (2) Diagnose respective units: confirm Status Online; check Outside / Space / Supply temps; check Cool1/2/3 and Heat 1/2/3 relays. Standard setpoints are 68°F heat / 72°F cool. (3) Use the decision steps — space below heat SP with heat relays OFF → heat failure → HVAC WO in Corrigo; space above cool SP with cool relays OFF → cooling failure → HVAC WO; relays ON but space not moving toward setpoint → check Supply temp (Supply not colder than space/outside in a hot store → mechanical cooling issue → HVAC WO; Supply not warmer than space/outside in a cold store → mechanical heating issue → HVAC WO). (4) Only consider a temporary override after mechanical / programming issues are ruled out and the store still reports comfort issues. (5) Call the Chedraui OC; explain the diagnosis and proposed override; obtain explicit approval for new setpoints, start time, and duration; ask how high/low and how long. (6) In Ultrasite, right-click the setpoint → Override → set the values exactly as approved (Timed type, with the approved hours). (7) Document in both Corrigo (create a non-dispatched WO and DON'T SEND IT) and the Keedian ticket: requester, approver, what was approved, how long, how much, what changed. (8) When the approved time expires, clear the override and return to 68°F/72°F; update both tickets; cancel the non-dispatched Corrigo WO.
Escalation
(1) Unit Offline → check Corrigo for open/pending WOs for the asset; if none, create a WO for the unit and advise the MOD this is the cause (no setpoint change needed). (2) Setpoint sensor readings look implausible (-100°F / 200°F) → suspect bad sensor → create an urgent WO for sensor replacement. (3) Vent location is forcing comfort drift (warm air pooling at high vents during heat call) → flag to facilities; explain wait time to store.
Author
David Dillard
Tools
Ultrasite Corrigo Keedian Platform Phone (Chedraui OC)
Roles
BSS — Refrigeration team Chedraui Operations Center (approver)

Purpose

Use this SOP when Chedraui store personnel report that an area feels too hot or too cold and request an HVAC setpoint change from the standard 68°F heating / 72°F cooling settings. Distinguish true mechanical / programming issues from comfort-only requests, obtain the required Chedraui OC approval before any override, and fully document decisions in Corrigo and Keedian.

Scope

All BSS levels within the refrigeration team handling Chedraui sites.

Setpoint policy

Standard cooling
72.0°F
Standard heating
68.0°F
Exception approver
Chedraui Operations Center
Notes
Standard setpoints are 68°F heating / 72°F cooling. Any temporary override requires explicit Chedraui OC approval (new setpoints, start time, duration). Store personnel alone cannot authorize a change.

Procedure

1. Log the Request
  • Create or update a Keedian ticket: store ID, caller name/role, areas affected (whole store, meat, warehouse, offices), and whether the complaint is too hot or too cold.
  • Connect to the site in Ultrasite and record current zone temperatures and setpoints in the ticket.
  • Any setpoint change must be approved by Chedraui Corp; store staff alone is not sufficient approval.
2. Diagnose Respective Units
  • Open the circuit in Ultrasite under the rack; check every rack for HVAC / RTU / AHU flags.
  • Confirm Status (Online vs Offline). If Offline, check Corrigo for open/pending WOs; if none, create a WO and advise MOD — no setpoint change needed.
  • Read Outside (incoming air), Space (face-level temperature, the key reading), Supply (air being pushed in), and the Cool1/2/3 + Heat 1/2/3 relays.
  • Cool / Heat SP = the parameters store personnel are requesting to change; standard is 68°F heat / 72°F cool.
  • OCC and UNOCC are occupancy-mode setpoints — for Chedraui they are equal; some clients use bigger UNOCC offsets for energy savings.
  • Diagnosis decision steps: Space below heat SP & heat relays OFF → heat failure → HVAC WO; space above cool SP & cool relays OFF → cooling failure → HVAC WO; relays ON but Space not moving → check Supply (not significantly colder/warmer than space/outside → mechanical issue → HVAC WO).
  • Only proceed to override when relays work, Supply temps look correct, and comfort remains an issue (possible comfort / air-distribution problem).
3. Approval and Apply the Override
  • Only after ruling out mechanical / programming issues.
  • Call the Chedraui OC; explain the diagnosis and proposed override; obtain explicit approval (new heating/cooling setpoints, start time, duration / end time).
  • Document the approved values and duration in Corrigo (non-dispatched WO) and the Keedian ticket.
  • Apply the override in Ultrasite exactly as approved: right-click the value → Override → Type Timed, set the time and value.
  • At end-of-window, clear the override and return to 68°F / 72°F; update both tickets.
4. Document in Corrigo and Keedian
  • Create a non-emergency Corrigo ticket and DO NOT send it — it exists only for OC and Keedian tracking.
  • Create a separate Keedian ticket documenting the change: who requested, who approved, how much, for how long, what changed.
  • After the override expires and is cleared, cancel the non-dispatched Corrigo WO.

Quality assurance

  • All diagnosis checks (status, space vs supply vs outside, relay states) are completed and documented.
  • Any suspected mechanical or programming issues result in a Corrigo WO.
  • Any override has Chedraui OC approval, documented setpoints, and a clear end time recorded in both Corrigo and Keedian.
  • Requester, approver, scope, duration, and magnitude are recorded in both Corrigo and Keedian.

Troubleshooting

Sensor location is distorting the reading.
Cause — Space-temp sensor placed too high / too low / near ovens or freezers.
Solution. Move the sensor to a more representative location — that alone often solves the issue without replacement.
Slow warm-up despite heat call.
Cause — Vents are very high; warm air accumulates near the ceiling before reaching the space.
Solution. Long-term fix is to relocate the vents (often impractical). Explain the wait to the store; consider supplemental measures.
Reading shows -100°F or 200°F with sudden change in the logs.
Cause — Failed sensor — drives permanent heat or cool calls.
Solution. Create an urgent WO for sensor replacement; inform the store of the issue.

Documentation & reporting

  • Record requester, approver, areas affected, original / new setpoints, duration, and rationale in both Keedian and Corrigo.

Revision history

VersionDateAuthorChanges
1.0 03/20/2026 David Dillard Initial draft.
1.1 06/04/2026 David Dillard Revised.