Productization
← Back to SOPs catalog
Keedian operations · Standard procedure

Per-circuit consumption step-change.

A sub-metered circuit's consumption or run-fraction steps change with no merchandising or load change.

01 Detail

Trigger, action plan, and escalation criteria.

optimization_metric energy high optimized tier AI: hybrid
Related metric
per_circuit_load
Trigger
circuit_kwh or run_fraction step-change vs baseline
Value drivers
Avoided truck rolls Asset lifespan Energy savings
Preconditions
Per-circuit submetering on the load.
Human role
Scopes the equipment check and the visit.
Action plan
(1) Attribute the change to the exact circuit (RTU, refrigeration rack, lighting panel). (2) For refrigeration/RTU: check door seals/gaskets, condenser-coil fouling, refrigerant charge before product loss. (3) Convert an emergency truck roll into a scheduled visit with the right scope.
Escalation
(1) Step-change with a rising-current signature → degradation; book service before failure. (2) Circuit drawing during scheduled off-hours → schedule/contactor fault.
Prevention
(1) Per-circuit baselines refreshed after equipment or merchandising changes.