Generator fuel low.

Usable fuel has been drawn down so the standby generator's run-time falls under the building's required autonomy — the generator leg of the ride-through is short even if the UPS bridge is intact. Read-only: Keedian surfaces the run-time shortfall and refers refuelling to the customer and the electrical / power vendor.

01 Detail

Trigger, action plan, and escalation criteria.

optimization_metric continuity high managed tier AI: hybrid
Related metric
backup_autonomy
Trigger
usable_fuel_runtime_hours < required_runtime_hours
Value drivers
Operational continuity
Preconditions
The generator's required run-time (autonomy) and fuel policy agreed per set; the fuel-level signal mapped and verified; the consumption rate at load recorded so run-time is computed, not assumed.
Human role
AI tracks usable fuel against the required run-time and routes the refuelling referral; operators confirm the fuel signal is current, notify the customer, and coordinate refuelling.
Action plan
(1) Confirm the fuel reading is current and correctly mapped before treating the shortfall as real; a stuck or mis-scaled tank sensor manufactures a false low-fuel alarm. (2) Convert the usable fuel to run-time at the present consumption rate and compare against the set's required autonomy, not a bare tank percentage. (3) Refuelling is the customer's / vendor's — Keedian surfaces the run-time shortfall and the volume needed and refers it; the generator is not commanded. (4) Where several sets trend down together, present the pattern as a fuel-management item rather than a string of single referrals.
Escalation
(1) Fuel run-time below the required autonomy while the primary source is stressed or an outage is forecast → direct customer + vendor alert before the set is called on. (2) A low-fuel run-time on a set covering a load the customer has flagged as material → out-of-cycle notification. (3) Tanks recurringly drawn down and slow to refill across several buildings → carry into the MBR as a fuel-management program candidate.
Prevention
(1) Agree the fuel policy and the required run-time per set at onboarding as the reference the fuel level is reported against. (2) Verify the fuel-level signal maps and scales correctly so the run-time estimate reflects the tank, not a default. (3) Trend fuel level against consumption at load so a slow draw-down is visible and refuelling is scheduled before the run-time is short.