(1) Review required fields (store, dates, equipment, HVAC/lighting/both, setpoint, 24-hour, area, explanation); if lighting-only, redirect as a Schedule Request.
(2) Confirm setpoint rules (cooling ≥71°F, heating ≤70°F); exceptions require explicit approval from Tra*** McW*** (JCPenney approver). Approver edits override prior instructions.
(3) Copy only the relevant email content into the ticket (from "Reference #" through "Provide detailed explanation…"); never include the full chain.
(4) Create a Mechanical Variance Request – Email ticket; if the approver changed anything, surface those changes at the top.
(5) Apply the override per platform: SC/SC+ adjusts only Setpoint Temperature (not offset); Niagara/Tridium uses right-click → Actions → Override (timed where available; if only SET, note it as permanent); PMT overnight uses start 00:00 / stop 23:59 / zero offsets; Trane/Summit sets BOS → Occupied with Priority P4; non-PMT Niagara/Tridium uses occupancy override under HVAC Area or Unit; iScope uses Scheduler → HVAC Area with core offsets -12:00 / 12:00.
(6) Document overrides, schedules, occupancy adjustments, and dispatch settings (Level 1 EMS / Level 2 Corporate Request / Level 3 Mechanical Variance, Remotely Resolve → Dispatch Technician).
(7) Run the final validation check (matches approval, within limits, correct equipment only, overnight schedule accurate, ticket notes step-by-step).