Uptime of the critical systems a site depends on to stay open — power continuity, vertical transport, and life-safety
Uptime of the critical systems a site depends on to stay open — power continuity, vertical transport, and life-safety.
| ROI relationship | Indirect / hard to quantify |
| Used by products | In the catalog, ready to consume — not yet listed on a product page. |
Keeping critical systems available — power continuity, vertical transport, life-safety, and the assets a site depends on to stay open — avoids the cost of an outage: a floor evacuated, an elevator stalled, a site closed until a vendor arrives. The avoided-outage cost is scenario-dependent, so the value is real but indirect and hard to reduce to a single number.
The optimization metrics whose impact on operational continuity is Direct, primary or Direct, strong — the strongest links — with how each one moves it. The full set of links (including weaker ones) is on the matrix.
| Metric | Impact strength | How it moves this driver |
|---|---|---|
| Continuity Posture | Direct, primary | Posture is the single readiness number for whether the building rides through a primary-source failure. Every not-ready critical point it surfaces is an outage that would otherwise have been discovered during the event it was meant to cover. Per-building magnitude is expected (pending validation) — offices have no named Keedian reference deployment yet. |
| Backup Autonomy | Direct, primary | Autonomy is the depth of the building's cover — how long it actually rides through, not just whether backup starts. Surfacing a shrinking estimate turns a too-short ride-through from something discovered mid-outage into a scoped battery-service or refuelling item done ahead of need. Per-building magnitude is expected (pending validation) — offices have no named Keedian reference deployment yet. |
| UPS Battery Readiness | Direct, primary | The UPS bridge is the first and most time-critical leg of the ride-through — if the battery bank collapses under load, the transfer to the generator never completes cleanly. Surfacing the fade, the failed test, and the bypass events turns a silent UPS failure into a scoped battery service done ahead of need. Per-building magnitude is expected (pending validation) — offices have no named Keedian reference deployment yet. |
| Generator Start Readiness | Direct, primary | The generator is the long leg of the ride-through — once the UPS bridge runs out, an unstarted set means the outage is now the customer's outage. Surfacing a MANUAL mode, a dead start battery, or a no-load test turns the single most common continuity failure into a scoped vendor action done ahead of need. Per-building magnitude is expected (pending validation) — offices have no named Keedian reference deployment yet. |